Glen Cedar Bridge Engineering Repairs

After awaiting the results from the engineering assessment carried out this past summer for the Glen Cedar Bridge, it is nice to see that my request for a temporary measure to provide a clear view of the ravine was approved and carried out this Fall.  Viewing windows have been created on both sides of the bridge since the sidewalk platforms were able to be re-enforced and stabilized to meet safety standards.  Thanks to the residents passing by who provided their opinion to help decide the window locations!  The full remediation work for the bridge should begin at the end of summer 2017 with final completion expected in Spring 2018.   I will be meeting with city staff in the New Year to go over the full scope of work for the bridge.  A community consultation will be scheduled for residents to learn more and provide feedback sometime in late winter.  For further details see the previous post from July 2016.

 

glencedarbridge_window



X